Demolition of 7 decks (lenght 260 m) of a bridge on the river “Piave” (TV).
Demolition of a 200m long bridge in Gorizia, that was very close to the new bridge (only 2,5 m).
Demolition of some pillars of the railway bridge in Pontetaro (PR).
Demolition of a deck along the highway “Cisa” in Fornovo (PR).
Demolition of the overpass along the highway Turin-Savona.
Demolition of a pillar of the overpass “Roccaprebalza” (along the highway “Cisa”).
Demolition of some pillars of the viaduct “Le Vigne”, along the highway “Cisa”.
Demolition of a bridge along the road “Villa Minozzo-Reggio Emilia”, very close to the new bridge.
Demolition of eight pillars of "Carito" bridge along the highway "Salerno-Reggio Calabria" in Altilia (CS). The distance between the old and the new bridge was 1 and 3 meters.
WATCH VIDEO
Night demolition of a bridge along the highway in San Donà di Piave (VE).
WATCH VIDEO
Demolition of the bridge "Gazziano" - Highway A3 Salerno-Reggio Calabria (Contract SARC with Impregilo-General Smontaggi)
WATCH VIDEO 1
WATCH VIDEO 2
Demolition of the bridge "Costaviola" - Highway A3 Salerno-Reggio Calabria (Contract SARC with Impregilo-General Smontaggi)
WATCH VIDEO
Demolition of the bridge "Caffaro" - Highway A3 Salerno-Reggio Calabria (Contract with Grandi Lavori Fincosit-General Smontaggi)
WATCH VIDEO